How can I permanently stabilize road shoulders?
With a system like Road Edge Pave. Flexible PE-HD elements with an open-pore framework distribute loads, allow rainwater to infiltrate, and prevent rutting of the shoulder.
What does "shoulder stabilization" mean for road shoulders?
It refers to long-term stabilization of road shoulders/side strips, e.g. along asphalt edges, at junctions, roundabouts, or medians - without continuous concrete edging.
Is Road Edge Pave suitable for truck traffic?
Yes. With a proper subbase, the system provides a load capacity of up to 3100 kN/m2.
Can I install it in curves and roundabouts?
Yes, the elements can be laid seamlessly from straight to a laying radius of up to 9.5 m.
Do I need concrete or a dedicated drainage layer?
No. The open-pore structure works like a grass grid and promotes infiltration. What matters is a load-bearing, level subbase and a slight outward crossfall (approx. 1-3%).
How is the system anchored in the ground?
Each element has 9 ground crosses (approx. 30 mm) for anchorage, plus interlocking connectors between the plates.
How does the installation work?
Prepare the subgrade, install and screed the bedding layer, lay and connect the elements in the direction of travel, fill the cells with 0/16 or 0/22 mm aggregate, then compact and sweep. See the installation guide.
Is there an installation guide?
Yes - our installation guide describes all steps from subbase through backfilling to final compaction and sweeping.
Can road shoulders be greened?
Yes. The chambers can be filled with soil and grassed - similar to a grass grid. Important: After placing the soil you must top up; you can also slurry first and top up afterwards.
What are the element dimensions and coverage per piece?
Approx. 800 x 400 mm; height 50 mm plus 30 mm ground anchors. 1 piece ~ 0.77 m length.
What material and chemical resistance does the system have?
Made from pure PE-HD; resistant to oil, fuels, de-icing salt, and many acids.
How do I treat the asphalt edge at the roadside?
Install the panels flush with the asphalt surface; keep a gap of about 2-5 cm. Larger joints should be properly sealed with hot or cold asphalt.
Where can I find the technical data and specification text?
See the Technical data and the Specification text.
How much does shoulder stabilization cost?
That depends on quantity, logistics, and site conditions. Please request a quote.